Through RMI’s association with Group partner, Etech NZ, RMI was engaged to design, fabricate and install new walkways and handrails to complete the installation of a new silo and plinth at the Fonterra Cooperative Group Limited’s Palmerston North facilities.
Fonterra Cooperative Group
-
Designs for this project were modelled through Etech Engineering Services with drawings and 3D renders provided to the customer for approval. The 3D renders provided additional value to the customer as they facilitated internal stakeholder engagement and feedback before design approval was granted.
-
Once the platforms were fabricated, installation was carried out on-site by trained and competent tradesmen who were compliant with the customers requirements around site access and Fonterra permit to work systems.
-
Relevant Quality Assurance documentation such as Material Certifications, Welder Qualifications and Non Destructive Testing Reports were gathered throughout the project and collated by our in house Quality Assurance Coordinator who provided a QA package compliant with our customers expectations.